How to Calculate the Cost of Changing Hydroelectricity to Modify Hydropower Costs

Hydroelectric renovation project is the most important part of renovation construction, because it is a hidden project. Once it is renovated, if you want to change it, it will not cause trouble, and it will also result in extremely high costs. Therefore, it is necessary to pay attention to the renovation. . What is the approximate price of water and electricity for that installation ? How to calculate the cost of water and electricity? Let's take a look.

First, install revised water and electricity prices

The price of water and electricity for the decoration of hydropower projects is mainly divided into three parts: installation of strong power, installation of weak currents, and modification of waterways, and there are two prices for slotting and not grooving. This is a prerequisite for consultation before renovation. Ok.

1. Change the price of strong electricity

In general, a flame-retardant electrician in a strong electrician does not have more than three wires, and if it exceeds three wires, it must be 5 yuan per meter; if the wires in the tube have no joints, the breakout box is also used at the breakout point; Type 86 is 10 yuan/set, 118 type is 15 yuan/set; multiple pipes are charged by multiple dark lines, dark pipe is 35 yuan/m, open pipe is 25 yuan/m, and after embedding, gypsum or Cement mortar filling.

2, change the weak electricity price

Weakening power mainly includes telephone lines, television lines, network cables, audio lines, video lines, audio lines, background music, etc. The line pipe is generally a PVC flame-retardant electrical pipe with a diameter of D16; a low-voltage switch socket box 86 Type 10 yuan / month, 118 type 15 yuan / month, if the installation of 16 information integrated box then add 160 yuan / set; to ensure that there is no joint in the pipe, the price of the dark pipe is 28 yuan / m, bright tube The price is 18 yuan/m.

3, change the waterway price

The waterway is mainly used concealed 20PP-R water pipe, the price is 60 yuan / m; surface mounted 20PP-R water pipe, the price is about 45 yuan / m; there are 50PVC pipe installation, the price is 60 yuan / m is about. Among them, 25 water pipes add 10 yuan per meter, and less than one meter is calculated by one meter; if there is additional charges for drilling, the load-bearing wall is 40 yuan/piece, and the non-bearing wall is 20 yuan/piece.

Second, how to calculate the cost of water and electricity

1, hydropower messes up the budget, the above mentioned that slotting and not grooving are two prices, it is mainly decided by the developers and the needs of the owners, how to calculate the specific or depends on the actual situation;

2, according to meters installed to modify the water and electricity prices , according to the number of laps used to determine its length (how many meters away), the price is generally not fixed, there are also 20,000 on the price;

3, quoted according to the actual amount of calculation, the same is based on meters, the water installed price of about 40/m2, installation of 50 square, circuit ground ceiling generally within 20 square feet;

4. The majority of the public's hydropower reform algorithm is, how many square of the house X per square meter of work price + material, which is in fact double the price of the package, if it is a single package, then do not material.

Editor's Note: The above is an introduction on how to calculate the price of water and electricity and how to calculate the cost of it. I hope that the sharing provided by Xiao Bian will help everyone. If you want to learn more about decoration, you can follow our website information.

Single Flute Spiral Milling cutter

Single Edge Milling Cutter,Engraving Milling Cutter,Spiral Milling Cutter,Acrylic Board Engraving Milling Cutter

Guofu Technology Group Co., Ltd , https://www.guofutools.com