Be wary of bathroom decoration, missing decoration, three things, not to be missed

The water circuit of the bathroom decoration is arranged in a ring, and the new decoration pays more attention to the living room, bedroom, etc., leaving less in the bathroom. In the bathroom with high frequency of use, once the decoration is missed, it will inevitably lead to secondary decoration. It is a small matter to make a wall, and even need to move the floor. Just think about it. Then be wary of missing bathroom decoration, so that no regrets.

1. Be careful not to damage the original waterproof layer when renovating hydropower

Generally speaking, as long as the new owner of the decoration owner has passed the quality inspection, it has already made a waterproof layer, but many decoration owners will transform the layout of the bathroom and the water supply and drainage pipeline when the hydropower transformation is carried out. Therefore, consumers must supervise the construction. Emphasize to the decoration workers not to damage the original waterproof layer. If it is forced to destroy the original waterproof layer, it must be repaired in time, or even redo waterproofing to ensure that no leakage will occur.

2, choose the positive solution of waterproof material

The waterproof material recommended by the Ministry of Construction is a one-component environmentally-friendly polyurethane coating, mainly because it can tightly enclose the pipe and the ground, penetrate into the gap, and does not shrink after drying. It is more suitable than rigid materials such as waterproof cement. In the bathroom, there are many small-sized houses with many pipes and gaps. The cost of this kind of paint per square meter is about 50~60 yuan, which is the price that the general decoration owners can bear.

3, can not paint waterproof material in rainy days

In order to have a good waterproof effect, the waterproof coating must be painted three times. The dry period of the one-component environmentally-friendly polyurethane coating is about 3~4 days. If the waterproof material is applied in the rainy day, the effect of the waterproof coating is Not very good.

4, do a good job of ground waterproofing

Before paving the floor tiles, it is necessary to do a waterproof project; after the tiles are laid, it is necessary to ensure that the brick surface has a water discharge slope (generally about 1%), and the slope faces the floor drain, which is beneficial to wastewater discharge.

5, do a good wall waterproof

When the bathroom is bathed, it will splash water to the adjacent wall. If there is no waterproof layer protection, the partition wall and the opposite corner wall will be mild and mildewed. Therefore, it is necessary to make the wall waterproof before the wall tile is applied. Generally, the wall surface should be waterproofed to 30 cm in height, but the non-load-bearing light wall should be waterproof. At least To be 1.8 meters high.

6, must do waterproof inspection

After the waterproofing project is finished, in order to be safe, it is still necessary to do waterproof inspection. If the waterproof inspection is unqualified, it must not be made. The construction team should redo the waterproof project. If there are conditions, you can ask the professional decoration person to help supervise the waterproof project. Going on.

LED Grow Panel

LED Grow panel include led grow light bar, Panel Grow Lamp, full spectrum led grow light works well for all plant growth, can replace sunshine light.

We can make red blue lighting and 4000k white lighting, many models panel grow light for you to choose.

Plant grow lamp is used in applications where there is no natural light or where supplementary light is required.
For example, in winter, when the possible hours of daylight may not be enough to achieve the desired plant growth.
Led Plant Light

Led Grow Light Complete Kit


Full Spectrum Panel,Panel Grow Lamp,Grow Light Bulb,Led Plant Light

Shenzhen Wenyi Lighting Technology Co., Ltd , https://www.wygrows.com