Change the water pipe precautions

For the workers who often do hydropower, the sewers can be modified without modification, and the risk of changing the sewers is very high. If the owners do need to change the sewers, it is not an unfinished task. In fact, the sewer pipe reform pays attention to some related issues. Note. Then the transformation of the sewage pipeline is no longer a difficult task. Let's take a look at what matters should be paid attention to when changing the water pipeline .

Change the water pipe precautions

First, when sewer pipes are rebuilt and brushed, it is necessary to clean up the dregs at the interface and apply glue to the inner circle of the pipe fittings and the outer circle of the pipe. This process is very important. If it is not constructed properly, it may result in Leaking pipes.

2. The entire building's sewers must be equipped with exhaust outlets, and remember to design a vent at the highest point. Otherwise, the rot in summer sewers will ferment, not only stinking, but also healthy. unfavorable.

Third, the slope must be mastered when installing the water pipe. Generally, the water inlet should be higher than the outlet. The slope ratio is not strict but it is necessary to pay attention to the elevation of the ground after installing the sewage pipe.

Fourth, remember to add a deodorant elbow, to carry out the transformation of the sewage pipe in advance with the downstairs tenants to negotiate, starting from the downstairs construction, otherwise it will be difficult to add deodorant elbow. If you do not add a deodorant elbow, the odor can easily enter the room through the pipe.

Fifth, the sewer pipeline should not be too long, otherwise it will have an adverse effect on the drainage, and it will easily lead to blockages. Once a problem arises, it will be difficult to repair.

Sixth, after the completion of the transformation of the sewer pipe, remember to seal it so as not to get the cement into the sewage pipe during the construction of the floor tile. Once the cement is solidified, it will be difficult to clean it. Only the water pipe can be replaced. The trouble is too great.

7. After the transformation of the sewer pipe, an irrigation experiment must be carried out to ensure that the pipe is fixed after water is not leaked. The pipe on the ceiling should be fixed with a lifter and the distance should be uniform. The pipe on the ground should be buried with cement or plaster.

Eight, after the transformation of the water pipe, remember to do a good job of waterproofing and add a layer of protection for the pipeline.

9. The right angle elbow should be reduced as much as possible at the corner to reduce the resistance of the drainage. In addition, do not use elbows smaller than 90° and the drainage resistance will be greater.

The above are the precautions for changing the water pipeline, and we hope to help you to transform the sewage pipeline. For more information on hydropower reform, please continue to pay attention to the information on this site.

Toilet plumbing to dredge the house decoration notes home decoration notes decoration notes housing decoration notes

Baby Bathtub

Baby Bathtub

Baby Bathtub,clawfoot tub feet types,Baby Bathtubs,modern freestanding tub,Walk-in Bathtubs

Guangzhou Aijingsi Sanitary Products Co.,Ltd , https://www.inspirationhottub.com